Report of the Board of Metropolitan Park Commissioners Volume 25.cMassachusetts Commission
---------------------------------------------------------------
Author: Massachusetts Commission
Number of Pages: 26 pages
Published Date: 01 Mar 2012
Publisher: Rarebooksclub.com
Publication Country: Miami Fl, United States
Language: English
Format: eBook
ISBN: 9781130586497
File size: 12 Mb
Download Link: Report of the Board of Metropolitan Park Commissioners Volume 25
---------------------------------------------------------------
This historic book may have numerous typos and missing text. Purchasers can download a free scanned copy of the original book (without typos) from the publisher. Not indexed. Not illustrated. 1918 Excerpt: ...Roxbury, . $427,405 00 Holbrook, Cabot & Rollins Corporation, Boston, .. 381,074 00 Bay State Dredging and Contracting Company, Boston, . 358,363 50 The amount of the low bid together with the estimated cost of the steel drawbridge and engineering and inspection would still exceed the total appropriations, and all bids were again rejected. The old wooden pile trestle bridge was in very bad condition, and it was thought advisable by the Commission to construct the wooden temporary bridge necessary in the work of building the new permanent bridge and turn public travel onto this, thereby saving the cost of extensive repairs to the old bridge. For this work the following bids were received on July 31, 1917: --Bay State Dredging and Contracting Company, Boston, . $58,500 00. George T. Rendle Company, East Boston, .... 48,900 00 Rendle & Stoddard Company, Chelsea, 46,500 00 In connection with these bids, proposals were also asked to do the work on a percentage basis. That of the Hugh Nawn Contracting Company was deemed best for the interest of the Commonwealth, and a contract was made on the following basis: --The Commission was to furnish all materials. The Contractor was to furnish all plant at stated rental prices. The Contractor was to furnish all laborers and mechanics at the prevailing prices plus 10 per cent. Contracts were made by the Commission for the materials, and the work was begun. About this time the Federal government commenced the construction of the Victory Plant at Squantum near the site of this bridge, and great difficulty was encountered in obtaining materials, plant and men, as the work at Squantum has precedence over our work. Therefore, instead of being completed about the first of the year as was expected, our work, although still in pr...
Read online Report of the Board of Metropolitan Park Commissioners Volume 25
Buy and read online Report of the Board of Metropolitan Park Commissioners Volume 25
Download Report of the Board of Metropolitan Park Commissioners Volume 25 for pc, mac, kindle, readers
Download to iPad/iPhone/iOS, B&N nook Report of the Board of Metropolitan Park Commissioners Volume 25
Other entries:
Garfield Bigger Than Life
Download ebook Contemporary Trends in Organization Development and Change
A History of Handguns
German Phase 3, Unit 23 : Learn to Speak and Understand German with Pimsleur Language Programs book
theme essay writing lesson
Autonomous Mobile Systems 2012 download torrent
The Cloud with the Silver Lining (1852) pdf
space shuttle discovery patches
John Bull, Junior ebook